How It Works

Our Service Process

A clear, transparent process from first enquiry to final handover — so you always know what to expect.

Flooring

Flooring Installation Process

From enquiry to warranty — here's how we deliver your flooring project.

Step 01

Enquiry

Contact us via WhatsApp or our contact form. Share your project details, approximate area size, and preferred flooring type. We'll respond within 1 business day.

Same day
Step 02

Site Measurement

Our team visits your site for a free, accurate measurement. We assess the existing floor condition, check for leveling issues, and recommend the best flooring solution.

1–2 days
Step 03

Quotation

We provide a detailed written quotation covering materials, labor, and any additional work (e.g., self-leveling, hacking). No hidden charges.

1–2 days
Step 04

Installation

Our experienced in-house installers carry out the flooring installation professionally and efficiently. We protect your furniture and clean up after completion.

1–3 days
Step 05

Handover

We conduct a thorough quality check with you before handover. Any touch-ups are done on the spot. We provide care and maintenance instructions.

Same day
Step 06

Warranty

All flooring installations come with a workmanship warranty. We stand behind our work — if there are any installation issues, we'll fix them at no extra cost.

1 year warranty

Cabinet

Cabinet Installation Process

From design consultation to installation — here's how we build your dream cabinet.

Step 01

Enquiry & Consultation

Reach out via WhatsApp with your requirements. Share photos of your space, preferred styles, and budget range. We'll schedule a free consultation.

Same day
Step 02

Site Measurement

Our designer visits your site to take precise measurements and understand your space constraints, electrical points, plumbing positions, and design preferences.

1–2 days
Step 03

Design & Quotation

We prepare a detailed design layout and itemized quotation. You'll see exactly what you're getting — materials, finishes, hardware, and all costs clearly stated.

3–5 days
Step 04

Production

Once confirmed, your cabinets are manufactured in our own factory. We use quality materials and precision cutting to ensure every piece fits perfectly.

2–4 weeks
Step 05

Installation

Our skilled installation team delivers and installs your cabinets on-site. We handle all the fitting, alignment, and hardware installation to perfection.

2–5 days
Step 06

Handover & Warranty

Final inspection with you to ensure everything meets your expectations. All cabinets come with a workmanship warranty covering installation defects.

1 year warranty

FAQ

Frequently Asked Questions

How long does SPC flooring installation take?

For a standard 3-bedroom apartment (approx. 1,000 sq ft), installation typically takes 1–2 days. Larger homes or those requiring extensive preparation work may take longer.

Do I need to move my furniture before installation?

Yes, furniture should be cleared from the installation area. Our team can help with minor furniture moving, but we recommend clearing the space beforehand for efficiency.

How long does kitchen cabinet production take?

Standard kitchen cabinets take approximately 3–4 weeks from confirmation to installation. Complex designs or custom finishes may require additional time.

Do you provide free measurement and quotation?

Yes, we provide free site measurement and quotation for all projects. There is no obligation to proceed after receiving your quote.

What areas do you cover?

We serve Selangor, Kuala Lumpur, Petaling Jaya, and Shah Alam. For projects outside these areas, please contact us to discuss.

What warranty do you provide?

All our flooring and cabinet installations come with a 1-year workmanship warranty. Product warranties from manufacturers apply separately.

Ready to Get Started?

Contact us today and we'll guide you through every step of the process.